Fix stage dependencies and typo in release build#19353
Fix stage dependencies and typo in release build#19353adityapatwardhan merged 2 commits intoPowerShell:masterfrom
Conversation
|
This PR has Quantification details
Why proper sizing of changes matters
Optimal pull request sizes drive a better predictable PR flow as they strike a
What can I do to optimize my changes
How to interpret the change counts in git diff output
Was this comment helpful? 👍 :ok_hand: :thumbsdown: (Email) |
|
🎉 Handy links: |
|
🎉 Handy links: |
|
🎉 Handy links: |
PR Summary
Fix indentation typo in release build.
Fix macos package signing stage / job dependencies.
PR Context
PR Checklist
.h,.cpp,.cs,.ps1and.psm1files have the correct copyright headerWIP:or[ WIP ]to the beginning of the title (theWIPbot will keep its status check atPendingwhile the prefix is present) and remove the prefix when the PR is ready.(which runs in a different PS Host).